The facility was built in the historic centre of the city, on the Petrograd side, so organising the removal of construction waste presented a particular challenge.
It was necessary to organise logistics in such a way that, firstly, residents of this densely populated area would not be disturbed and, secondly, freight transport would not be stuck in traffic jams.
Tasks:
- Dismantling of reinforced concrete structures
- Transportation of Class I-IV hazardous waste
- Volume of waste removed: 600,000 m3
Date:
2019–2021
Client:
Segmenta LLC