Completed projects

Industrial and logistics park "ULTRAMAR"


In 2019, Neorecycling began work on a large-scale project to build an industrial and logistics park, including the construction of maritime and railway infrastructure in the Vistino district of the Leningrad Region.
During the project, Neorecycling has already processed more than 1.5 million cubic metres of soil.

Work completed:
- Zero cycle.
- Soil excavation and removal of stump residues.
- Construction of embankments for building sites.
- Preparation of the site for construction.
- Transportation and disposal of Class V hazardous construction waste.
- Unique engineering solution for the organisation of construction waste recycling for reuse.

Timeframe: 2020 – present
Client: Ultramar LLC
Construction 3.1